Testing of boards or complete installations can be done in different phases according to the customer's requirements. Tests can be provided in our workshop before the material is placed on-site (fat test). Finally, a Site Acceptance Test (SAT) is performed on-site. This is traditionally done in the following phases:

  • I/O - Tests: testing all inputs and outputs and electrical connections
  • Cold testing: movement tests without a medium or product
  • Hot testing: production testing with product
  • Start-up and commissioning